Case Study #5

case-study-5
This agricultural well was not producing expected and necessary volumes of water. Shannon Pump pulled the pump, and WellJet went to work. Following WellJet, the same pump was immediately reinstalled.

 

The results were unbelievable:  production increased more than 350%, specific capacity more than quadrupled, overall pump efficiency more than doubled – and the cost to pump water decreased by more than 60%!

 

Aldo Enterprises Well #AV-1

Los Banos, CA

 

Project partner:  Shannon Pump Co., Merced, CA

 

Drill date:  2007

Casing type:  mild steel

ID:  14”

Perforations:  vertical slots

Total depth:  200’

Perforation zone:  80’-200’

 

BEFORE WELLJET: AFTER WELLJET:
Production:  483 gpm Production:  1,709 gpmIncrease:  1,226 gpm

Percentage increase:  354%

 

Drawdown:  56’ Drawdown:  48’ Improvement:  8’

Percentage improvement:  14.3%

 

Specific Capacity:  8.6 Specific Capacity:  35.6 Percentage improvement:  414%

 

Overall Pump Efficiency:  26% Overall pump efficiency:  66% Improvement:  254%

 

Cost per acre-foot:  $41.69 Cost per acre-foot:  $14.90 Savings per acre-foot:  $26.79

Percentage savings:  64.3%

 

Annual pumping cost:  $31,955  Annual pumping cost:  $11,421 Annual savings:  $20,534